13th Annual Smithsonian Magazine Photo Contest The American Experience
Running Behind Schedule

This photo was taken outside a junk store / "museum" in southern Maine.

Photo Detail
Date Taken: 01.2015
Date Uploaded: 10.2015
Photo Location: Maine, United States of America
Camera: Canon EOS REBEL T2i
Copyright: © Lynne Sabean